Following an unfortunate massive explosion in the Evangelos Florakis Navy Base on the 11th July 2011, the neighboring Power Station in Vassiliko which is the largest power facility in Cyprus and a major asset for the government, was severely damaged, causing widespread power cuts. Not long after this big shock that struck the Island, the Electricity Authority of Cyprus hired well respected companies to restore the base in really short time. Our company was awarded with the restoration of several crucial buildings in the station.
We have restored many of the severely damaged buildings in the station, amongst others the Administration Building, the Water Treatment Building, the Water Pump House and the Turbine Houses 1, 2 & 3.
The delivery time of the restored buildings was critical since the whole Island was suffering from the power shortages. Our company is proud that played an important role in restoring the power station and contributed in the comfort of the suffering citizens.